28Mar
2017

bathroom pods
Bathroom Pod Install Commences at Plymouth

The installation of 60 Bathroom Pods will commence this week at the student accommodation scheme, Crescent Point, in Plymouth.

The state of the art accommodation which is being built by Pickstock Construction utilising Elements Europe’s modular solutions is on schedule to open in time for the September intake of students.

Bathroom Pods will be installed into Block B which is a ten storey building, using a cantideck system. This method is being utilised due to the buildings concrete frame.

“Tower B is being built traditionally by our contractor company Pickstock Construction, with the inclusion of 60 Bathroom Pods” Commented Kate Pickstock Senior Development Surveyor.

The Bathroom Pod install marks the completion of the installation of Room Modules and Kitchen Pods into the taller of the two blocks.

“All 26 studio apartments, 263 en-suite bedrooms and 59 Kitchen Pods have been installed into tower Block A on schedule” commented Kate Pickstock Senior Development Surveyor.

The student rooms have been designed by The Pickstock Group and offer a contemporary design with ample space for studying and sleeping.

Latest
Telford college

Elements Europe Supports Local College

Elements Europe’s HR team went to support the merge of two local colleges this week. more
Room Pod Elements Europe

Elements Europe Attends London Housing Strategy Workshop

Elements Europe’s Managing Director Simon Underwood was invited to join forces with a diverse Group of Stakeholders involved in delivering housing throughout London to take part in the Mayor’s public consultation for the new London Housing Strategy. more
exhibiting and presenting

Exhibiting & Speaking at Off-Site Construction Show

Elements Europe will be exhibiting and speaking at the Off-Site Construction Show at Excel in London from the 11th to 12th October. more