04Apr
2016

Modular Class Room
First Modular Class Room installed at St Aidan’s School

Elements Europe has installed the first modular class room at St Aidan’s Primary Catholic Academy in Ilford.

Acting as both the main contractor and modular manufacturer, Elements Europe is providing a full turnkey solution, demolishing the existing class room block and reconstructing it over 2 storeys creating 9 new class rooms, 2 office and 2 WCs.

“Modular construction is ideal for schools and the education sector enabling a much faster solution allowing them to open in time for the start of term and minimising disruption” commented Kevin Arthur, Director at Elements Europe.

A total of 36 Room Modules will be manufactured and installed and have been designed with adaptability in mind allowing for 2 class rooms or 1 large space for events.

The new class room block will open in time for the September 2016 term.

Latest
modular construction

Elements Europe Manufactures Modular Tool Store

Elements Europe has manufactured a modular Tool Store for its Creekside Wharf residential development in Greenwich. more
prs modular scheme

Bathroom Pod Prototype Gets Approval

Elements Europe’s latest client The Collective has visited its manufacturing facility in the West Midlands to view a Bathroom Pod prototype for its East London PRS development at Baltimore Wharf. more
bathroom pods

Farmer Report Prompts Government Response

In October 2016 Mark Farmer published a report Modernise or Die, commissioned by the Construction Leadership Council. more