Off-Site Value: £2.6 million
Overall Value: £20 million
Architect: Robothams


The Client
Following the success of Phase 1, Elements Europe again were selected to manufacture and deliver bathroom pods for Phase 2 of the Warwick University student residences development.
Working in collaboration with Kier ,Phase 1 was successfully delivered in 2009. With Shepherd Construction appointed as the main contractor to deliver Phase 2 Elements Europe’s Solopod bathroom module system was again implemented, resulting in the delivery of over 1000 bathroom pods in total within Phases 1 and 2.
The Project
The Phase 2 extension saw the construction of 6 blocks of 4 storey accommodation providing the University with an additional 538 bedrooms. 6 universally accessible pods were supplied , all of which were fully tiled and designed according to the specification required by the university.
The scheme was required to achieve a BREEME excellent standard, therefore Elements Europe worked with Shepherd Construction to design a pod that would assist in achieving this standard. Features of the module include energy efficient lighting activated from motion detectors , low level water usage shower heads, taps, and dual flush toilet cisterns.