Middlewood Locks – Bathroom Pods

Client: BCEGI

Architect: WCEC

The Client

Elements Europe has been contracted by BCEGI, an international property developer to deliver 914 Bathroom Pods to a £700 million residential development in Salford.

Project Description: 914 Bathroom Pods

Elements Europe will manufacture, deliver and install all 914 Bathroom Pods into Phase 1 of the scheme. 9 varying types of Bathroom Pods will be manufactured for 6 blocks of apartments.

The 9 types of Bathroom Pods will vary in size and include; main bathrooms, en-suites, Jack and Jill bathrooms.

Elements Europe’s design team will work closely with WCEC Architects to achieve the varying and detailed specification. All of the bathrooms will be finished to a high standard featuring luxury brands such as Hansgrohe reflecting the quality of the apartments.

Install will commence in March 2017 in line with BCEGI’s schedule of works.